Wednesday, December 19, 2007

Installing new floating prefinished faux wood floor

Tuesday, December 18, 2007

Installing new water service line.

This is a customer that I'm working with. There main service water line to the home broke under ground.I am helping customer replace line. The customer will be pulling his own permit to have work completed. Was to start Wensday 11.28.07 was unable to start my scheduled back hoe operater has other comitments to meet. Found another operater to start this Saturday 12.1.07



Looking North from water meter to Murdock hydrant 75'





During 12/1/07


















Looking West water line to run 65' West from Mudock hydrant (Before)





During 12/1/07











During 12/1/07









Hand dug hole looking for 4" main gas line.





Looking in to meter hole at city supplied water meter






Looking into hand dug hole at orange 4" main gas line.





Main cutoff valve in home.










Job Completed 12.20.07
I want to thank Karl at K.B. Complete Plumbing Heating & Cooling, also Jerry at service supply. These two companies gave advice for this project and also donated materials or sold materials at cost. Thank you.




Saturday, December 15, 2007

Installed new Front door and storm storm door.


This customer had been broken into and front door was replaced with a new 32" Steel front door and storm. It was snowing all day long my toes are frozen and I feel like frosty the snowman. Old door had to be completely removed with the jam and all new framing installed.
On the inside of the door way there is a small foyer I stapled plastic to the wall to keep the cold out as we worked all day long on this project.

Thursday, December 6, 2007

Installed new tub valve washers and seats.

Installed new stove/oven. Cut counter top to fit.

Repaired wood rot at exterior window sill.

Repaired 2nd floor toilet leak and repaired ceiling under toilet on 1st floor.

Wednesday, December 5, 2007

Nail to the Head

Tuesday, December 4, 2007

Are Granite Countertops a Health Threat?