Sunday, November 25, 2007

Repairing spongie floor & installing tile.




This customer’s rear entrance floor area is spongy and needed to be repaired.
The first image is the tear out. The second image is a view of the support legs installed and the third is of the ¾ inch plywood installed.


Tile is layed out and final cuts are made.


Tile is set to floor with spacers installed.